Stafford has successfully installed its STF 7022 TL tower crane at the prestigious Goldwynn Resort project.
Positioned against the stunning backdrop of the crystal-clear Bahamian waters, this powerful crane will play a vital role in the next phase of construction for the luxury resort.
Engineered with a focus on safety and reliability, the STF 7022 TL was specifically selected to withstand the high wind conditions typical of the region. The crane boasts an impressive maximum reach of 230 feet and can lift up to 5,340 pounds at the tip, making it a robust choice for the demands of large-scale construction.
Its installation marks a significant milestone in the ongoing development of the resort, blending cutting-edge technology with the beauty of the surrounding environment.
From the crane operator’s vantage point, the view is nothing short of breathtaking, capturing the essence of building dreams along the shoreline.
The setup process, expertly handled on-site, ensures seamless performance and exemplifies Stafford's commitment to delivering exceptional equipment for complex projects.
As construction progresses, the STF 7022 TL will stand as a symbol of innovation and efficiency in a remarkable setting.